Focus Areas
Highlights in Bid Protest and False Claims Act Cases
- Won sustained decision in Wyle Laboratories, Inc., B-408112.2 (Dec. 27, 2013): Represented Wyle in successful sustained protest on $1.7 billion, 10-year NASA program for biomedical services supporting human spaceflight. Handled all protest issues relating to the SAIC corporate split and developed and wrote the arguments that formed the basis for GAO’s sustained decision. Upon NASA’s request for reconsideration, wrote the brief in opposition, resulting in GAO’s second decision in May 2014 affirming GAO’s decision to sustain.
- Won sustained decision in Computer Sciences Corp.; HP Enterprise Services; Harris IT Services Corp.; Booz Allen Hamilton, B-408694.7 et al. (Nov. 3, 2014): Represented HPES in successful sustained protest concerning Air Force awards for network operations at locations worldwide (Network Centric Solutions–2) (ID/IQ awards with maximum value of $960 million). Handled issues relating to past performance and developed and wrote arguments sustained by GAO.
- Represented a major consulting firm in multiyear FCA investigation and high-profile litigation concerning teaming and subcontractor arrangements in dozens of government contracts with the Department of Defense (DoD), the GSA Schedule program and multiple civilian agencies, resulting in successful settlement. Supervised the majority of offensive discovery and handled all issues relating to the Defense Logistics Agency at the core of the case.
- Represented a major government contractor in DoJ investigations arising from performance in foreign nations and war zones during the Iraq war.
Corrective Actions in Bid Protest Litigation
- Represented a major consulting firm challenging technical evaluations in a DoD competition for intelligence analysis services to the many agencies in the intelligence community, and caused the agency to make an additional award to the firm for a contract with a $5.6 billion contract ceiling.
- Represented a major IT hardware company challenging its exclusion from the competitive range, causing the U.S. Army to restore the company to the competitive range and initiate new discussions in the Army’s ITES-3 competition with $5 billion contract ceiling.
- Represented a software company challenging requirements restricting competition in an IT procurement by the U.S. Navy’s Space and Naval Warfare Systems Command, leading the command to reassess and make fundamental changes to the underlying requirements.
- Represented a major military base logistics provider, challenging technical and cost realism evaluations for management of a U.S. Army garrison, leading the Army to cancel the award and hold new discussions with offerors in the competitive range.
- Represented an international consulting firm challenging cost and technical evaluations in a USAID competition for development services in Afghanistan, leading the agency to request revised proposals and hold new discussions with offerors in the competitive range.
- Represented an international engineering joint venture bidding on a power generation contract for a U.S. Army base in Kuwait, leading to provision of historical data to bidders.
Additional Sustained Decisions in Bid Protest Litigation
- Secured GAO decision sustaining the protest for a major IT solutions company, challenging the evaluation of its technical demonstration by the Defense Information Systems Agency.
- Secured GAO decision sustaining the protest for a major helicopter flight services company, challenging the technical qualifications of an awardee’s proposal.
- Secured GAO decision sustaining the protest for a small scientific consulting business, challenging a sole source award by the Department of Energy.
Decisions in Favor of Awardees in Bid Protest Litigation
- Secured favorable CoFC decision for a GSA Schedule holder, in court to defend software orders from the Navy in support of the Navy/Marine Corps Intranet.
- Secured favorable agency decision for a leading manufacturer of U.S. military ordnance, competing for continued production at government-owned facilities after its proprietary information was released to competitors by the procuring agency.
- Secured favorable GAO decision for a major space systems company, defending an award by NASA in support of an Earth-observing satellite program.
- Secured favorable CoFC procedural decision for a systems engineering company, in court to defend an Air Force decision taking corrective action following a GAO protest.
Additional Litigation Experience
- Represented a major metal manufacturer (the primary defendant among dozens of responsible parties) in district court Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) litigation over World War II-era contracts and a historical tungsten processing site in New York, leading to successful settlement.
- Represented a major shipbuilder in state court litigation with the City of New York.
- Represented a major energy company with spent nuclear fuel claims against the government.
- Represented major telecommunications company in successful defense against Defense Contract Audit Agency (DCAA) audits.
- Represented union members affected by an outsourcing competition for Air Traffic Control services in proceedings before the Federal Aviation Administration.
- Represented a developer in state court litigation over a major city’s convention center hotel and real estate companies in litigation over municipal contracts and corporate securities.
- Represented an amicus party in a successful outcome before the U.S. Supreme Court, which expanded the contribution rights of potentially responsible parties in CERCLA litigation.
- Represented the National Veterans Legal Services Program with an amicus brief supporting a Navy veteran forced to retire prematurely, leading to correction of records by the CoFC.
Joe writes frequently on government contract issues and has been quoted by West, Law360 and Bloomberg/BNA publications. His academic articles and commentaries have been cited in law review articles, books, treatises, a decision of the U.S. Court of Federal Claims, and a brief to the U.S. Supreme Court.
- “DoD Allows Contracts for Products or Services Using FAR Part 12 to Serve as Prior Commercial Item Determinations,” Thompson Hine Government Contracts Update, June 2022
- “Forthcoming Federal Procurement Revisions Focus on Achieving Environmental Goals,” Thompson Hine Government Contracts & ESG Update, June 2022
- “OMB Issues New Buy America Guidance for Federal Infrastructure Projects,” Thompson Hine Government Contracts Update, May 2022
- “Final Rule Amends Federal Acquisition Regulation Part 25 Content Threshold Under Buy American Act: Important Considerations for Companies Providing Products to the Federal Government,” Thompson Hine Business Law Update, Spring 2022
- “SBA Revises Small Business Size Standards for 229 Industries,” Thompson Hine Government Contracts Update, April 2022
- “Out With DUNS, In With UEI: New Unique Entity Identifier Is Here,” Thompson Hine Government Contracts Update, April 2022
- “Final Rule Amends FAR Part 25 Domestic Content Threshold Under Buy American Act,” Thompson Hine Government Contracts Update, March 2022
- “Update on Federal Contractor and Subcontractor Vaccine Mandate,” Thompson Hine Government Contracts Update, February 2022
- “Federal Court Enjoins Enforcement of Federal Contractor Vaccination Mandate in Ohio, Kentucky and Tennessee,” Thompson Hine Government Contracts Update, December 2021
- “DoD Announces (New) CMMC 2.0,” Thompson Hine Cybersecurity & Government Contracts Update, November 2021
- “2022 Defense Bills Propel Recent Acquisition Policy Trends,” Law360, October 2021
- “FAR Council and Agencies Publish Class Deviation Clauses and Instructions to Implement EO 14042 Vaccine Requirements,” Thompson Hine Government Contracts Update, October 2021
- “Threat of Another Government Shutdown: What Contractors Need to Know and Do Now,” Thompson Hine Government Contracts Update, September 27, 2021
- “President Biden Signs Executive Order to Promote Competition in the U.S. Economy,” Thompson Hine Government Contracts Update, July 2021
- “How Biden’s First 100 Days Will Affect Gov’t Contractors,” Law360, May 2021
- “The American Rescue Plan Act: Funding Provisions for Government, Pandemic Response, Health Care, Infrastructure, Transportation, Science and Technology, and Oversight,”
Thompson Hine COVID-19 Update, March 2021 - “DOJ’s False Claims Act Recoveries in Fiscal Years 2020 and 2019,” Pratt’s Government Contracting Law Report, January 2021
- “GAO Bid Protest Filings Down in FY 2020; Effectiveness Rate Reaches Record High,” Thompson Hine Government Contracts Update, January 2021
- “Consolidated Appropriations Act, 2021: Implications for Business,” Thompson Hine COVID-19 Update, December 30, 2020
- “Defense Department Guidance for Government Contractors on Additional COVID-19-Related Costs,” Pratt’s Government Contracting Law Report, December 2020
- “What Gov’t Contracting Might Look Like Under Biden,” Law360, December 2020
- “Trends In Fiscal 2020 Bid Protests Sustained By GAO: Part 1,” Law360, November 2020
- “Trends In Fiscal 2020 Bid Protests Sustained By GAO: Part 2,” Law360, November 2020
- “DoD Publishes Interim Cybersecurity Rule on CMMC and DoD Assessments,” Thompson Hine Government Contracts Update, October 2020
- “DOJ’s False Claims Act Recoveries in Fiscal Years 2020 and 2019,” Thompson Hine Government Contracts Update, September 2020
- “Defense Department Guidance on COVID-19-Related Costs for Government Contractors,” Thompson Hine COVID-19 Update, August 2020
- “DoD Issues Class Commercial Item Determination for Critical Supplies & Services to Aid COVID-19 Response,” Thompson Hine COVID-19 Update, April 2020
- “Public-Private Partnership Created for Emergency Drug Packaging Solutions,” Thompson Hine COVID-19 Update, March 2020
- “DHS Issues Guidance on Identification of Essential, Critical Infrastructure Workers,” Thompson Hine COVID-19 Update, March 2020
- “Mitigating COVID-19’s Commercial and Business Impacts: SBA’s Loan Programs,” Thompson Hine COVID-19 Update, March 2020
- “How Federal Contractors Can Prepare for Coronavirus Disruptions,” Thompson Hine COVID-19 Update, March 2020
- “The COVID-19 Virus Presents Contracting Opportunities and Challenges to Life Science and Biotechnology Companies,” Thompson Hine COVID-19 Update, March 2020
- “Defense Department Implementing New Cybersecurity Certifications for the Industrial Base,” Thompson Hine Business Law Update, Winter 2020
- “Defense Contracting Law Developments From 2019,” Law360, January 2020
- “FY 2020 NDAA Signed into Law with U.S. Space Force, Cyber Operations & Acquisition Reforms,” Thompson Hine Government Contracts Update, December 2019
- “GAO Finds Opaque Ownership Structures Pose Risks to DoD Procurement,” Thompson Hine Government Contracts Update, December 2019
- “GAO Bid Protest Effectiveness Rate Remains 44% for Fiscal Year 2019,” Thompson Hine Government Contracts Update, November 2019
- “DOD’s Cybersecurity Maturity Model Certification and Draft CMMC Model Framework,” Thompson Hine Government Contracts Update, September 2019
- “A Midyear Look At DOD Government Contract Law Changes,” Law360, July 2019
- “Preparing for a DoD OIG Audit: DoD’s Focus on Small Business Set-Aside Contracts and Certifications,” Pratt’s Government Contracting Law Report, July 2019
- “DOJ Guidelines for Disclosure, Cooperation and Remediation in FCA Matters,” Thompson Hine Government Contracts Update, June 2019
- “Developments Affecting DOD Bid Protests,” The Government Contractor, April 2019
- “DOJ Recovers $2.8 Billion in False Claims Act Cases in FY 2018,” Thompson Hine Government Contracts Update, January 2019
- “Threat of Another Government Shutdown: What Contractors Need to Know and Do Now,” Thompson Hine Construction & Government Contracts Update, December 20, 2018
- “GAO Releases Bid Protest Annual Report for FY 2018; Effectiveness Rate Is 44 Percent,” Thompson Hine Government Contracts Update, December 2018
- “What Government Contractors Need to Know and Do After Hurricane Florence,” Thompson Hine Government Contracts Update, September 2018
- “Ninth Circuit Rules Escobar Two-Part Falsity Test Is Mandatory for Implied Certification Liability Under the False Claims Act,” Thompson Hine Government Contracts Update, August 2018
- “Annual Procurement Law Reforms in the FY 2019 National Defense Authorization Act,” Thompson Hine Government Contracts Update, August 2018
- “Bayh-Dole Act Amendments Governing Ownership of Government-Funded Inventions Take Effect Next Week,” Thompson Hine Government Contracts Update, May 2018
- “GAO Issues Final Regulations Implementing Electronic Protest Docketing System,” Thompson Hine Government Contracts Update, April 2018
- “DoD Implementing Enhanced Postaward Debriefing Rights via Class Deviation,” Thompson Hine Government Contracts Update, March 2018
- “GSA Releases Initial E-Commerce Portal Implementation Plan,” Thompson Hine Government Contracts Update, March 2018
- “Enhanced Debriefings and Bid Protest Pilot Program Included in FY 2018 NDAA,” Pratt’s Government Contracting Law Report, March 2018
- “GAO Issues Annual Bid Protest Report To Congress for FY 2017,” Pratt’s Government Contracting Law Report, March 2018
- “10 Government Contracting Trends to Watch This Year,” Law30, February 20, 2018
- “DOJ Policy Memos Signal Greater Checks and Balances for FCA Enforcement,” Thompson Hine Government Contracts Update, February 2018
- “Government Shutdown Threatened (Again): What Contractors Need to Know and Do Now,” Thompson Hine Construction & Government Contracts Update, January 18, 2018
- “RAND Corp. Report’s Recommendations to Defense Department on the Bid Protest System,” Thompson Hine Government Contracts Update, January 5, 2018
- “RAND Corp. Submits Report to Congress on Bid Protest Impacts to DoD Procurements,” Thompson Hine Government Contracts Update, January 3, 2018
- “DOJ Recovers $3.7 Billion in False Claims Act Cases in FY 2017; Total Recoveries Exceed $3 Billion Each Year Since 2010,” Thompson Hine Government Contracts Update, December 2017
- “GSA Issues Notice Regarding Commercial e-Commerce Portals Under NDAA Section 846,” Thompson Hine Government Contracts Update, December 2017
- “GAO Issues Annual Bid Protest Report to Congress for FY 2017,” Thompson Hine Government Contracts Update, November 2017
- “Enhanced Debriefings and Bid Protest Pilot Program Included in FY 2018 NDAA,” Thompson Hine Government Contracts Update, November 2017
- “Senate Passes $700 Billion 2018 National Defense Authorization Act, Including Procurement Reforms,” Thompson Hine Government Contracts Update, September 2017
- “Trump Administration Steps Up Buy American Enforcement,” Thompson Hine Government Contracts Update, July 2017
- “Government Contracts Under The Trump Administration,” Law360, January 2017
- “GAO’s Bid Protest Annual Report Shows Record High Effectiveness Rate While NDAA Calls for New Comprehensive Study of the Bid Protest System,” Thompson Hine Government Contracts Update, January 2017
- “Implied Certification Theory Under the False Claims Act – Approved by the Supreme Court,” Thompson Hine Business Law Update, Fall 2016
- “Texas Court Issues Nationwide Injunction Against Fair Pay and Safe Workplaces Final Rule,” Thompson Hine Government Contracts Update, October 2016
- “Effective Dates Approaching for Fair Pay and Safe Workplaces Final Rule Implementation,” Thompson Hine Government Contracts Update, October 2016
- “Supreme Court Decision Highlights Risks Related to Federal Programs, Contracts and Grants,” Thompson Hine Construction & Government Contracts Update, August 2016
- “The Most Prevalent Reason Why GAO Sustained Bid Protests In FY 2013,” The Government Contractor, July 16, 2014
- “Supreme Court Grants Petition for Review in Carter; Will Address FCA First-to-File Bar and Wartime Suspension of Limitations Act,” Lexology, July 2, 2014
- “Circuit Splits Surrounding FCA Endure Post-Takeda,” Law360, May 2, 2014
- “Keep An Eye On High Court’s Two Potential FCA Cases,” Law360, October 18, 2013
- “Petitions to Supreme Court Shine Light on FCA Circuit Rulings, Fourth Circuit Case Law,” Bloomberg BNA Federal Contracts Report, September 24, 2013
- “Fourth Circuit Decision On WSLA Paves Way For FCA Forum Shopping And More Stale Claims,” The Government Contractor, June 5, 2013
- “2012 Trends In Government Contracts Likely To Continue,” Law360, January 31, 2013
- “Cautionary Tales In Recent FCA Decisions,” Law360, October 16, 2012
- “Implied Certification Strikes Back: Expanding Precedent on Legal Falsity Under the False Claims Act,” Westlaw Journal Government Contract, May 14, 2012
- “Supreme Court Denies Blackstone’s Petition on Legal Falsity Under the False Claims Act,” Bloomberg BNA Federal Contracts Report, January 17, 2012
- “Recent Rulings on Implied Certification Under the False Claims Act: Limitations on a Common-Law Theory,” Westlaw Journal Government Contract, November 1, 2010
- “False Claims Act Returns to the Supreme Court,” The Government Contractor, Nov. 18, 2009
- “Judging The Common Law–Judge Sotomayor And The Government Contractor Defense,” The Government Contractor, July 22, 2009
- “Government Contracting Developments in President Obama’s First 100 Days – ‘No Little Plans,’” The Government Contractor, April 29, 2009
- “President Obama Heralds Change For Gov. Contracting,” The Government Contractor, Jan. 21, 2009
- “Believe That Change Has Come for Contractors,” Legal Times, November 5, 2008
- “The Year in Sustained Bid Protests at the U.S. Government Accountability Office and the U.S. Court of Federal Claims,” Public Contract Law Journal, Summer 2008
- “OFPP Evaluating Proposed Policy on Procurement of ‘Green’ Products and Services,” The Government Contractor, June 11, 2008
- “Affirmative Action for Veterans,” The Procurement Lawyer, Winter 2008
- “Subpoena Power at the Civilian Board of Contract Appeals—GSA Should Reconsider its Position and Reverse Course,” The Government Contractor, September 19, 2007
- “Supreme Court to Decide Boundaries of Government Liability Under CERCLA,” The Procurement Lawyer, Spring 2007
- “DHS Issues Final Rule Governing SAFETY Act,” The Government Contractor, June 14, 2006
- “The African Elephant, Human Economies, and International Law: Bridging a Great Rift for East and Southern Africa,” Georgetown International Environmental Law Review, 2001
- “Unilateral Trade Measures to Conserve the World’s Living Resources: An Environmental Breakthrough … the WTO Sea Turtle Case,” Columbia Journal of Environmental Law, 1999
- “Government Contracts Under the Biden Administration,” Thompson Hine Webinar, March 9, 2021
- Selected to Law360’s Government Contracts Editorial Board, 2022
- Selected to Law360’s Aerospace & Defense Editorial Advisory Board, 2021
- Listed in Legal 500, 2019 to 2021
Education
- Columbia Law School, J.D., 2000,
Harlan Fiske Stone Scholar (1999); Columbia Journal of Environmental Law, senior executive editor
- Dartmouth College, B.A., 1996
Bar Admissions
- District of Columbia
- DoD Allows Contracts for Products or Services Using FAR Part 12 to Serve as Prior Commercial Item Determinations,
Government Contracts Update
, June 23, 2022 - Forthcoming Federal Procurement Revisions Focus on Achieving Environmental Goals,
Government Contracts & ESG Update
, June 7, 2022 - OMB Issues New Buy America Guidance for Federal Infrastructure Projects,
Government Contracts Update
, May 17, 2022 - Business Law Update – Spring 2022,
Thompson Hine Newsletter
, May 12, 2022 - SBA Revises Small Business Size Standards for 229 Industries,
Government Contracts Update
, April 29, 2022 - Out With DUNS, In With UEI: New Unique Entity Identifier Is Here,
Government Contracts Update
, April 7, 2022 - Final Rule Amends FAR Part 25 Domestic Content Threshold Under Buy American Act,
Government Contracts Update
, March 14, 2022 - Update on Federal Contractor and Subcontractor Vaccine Mandate,
Government Contracts Update
, February 17, 2022 - Federal Court Enjoins Enforcement of Federal Contractor Vaccination Mandate in Ohio, Kentucky and Tennessee,
Government Contracts Update
, December 3, 2021 - DoD Announces (New) CMMC 2.0,
Cybersecurity & Government Contracts Update
, November 8, 2021